# Comprehensive Risk Register and Mitigation Strategy
## Kampong Speu Provincial Demographic Management System (KSP-DMS)

**Document Code:** KSP-DMS-DOC-RISK-01  
**Methodology:** ISO 31000 Risk Management Standard  
**Version:** 1.0 (Draft Proposal)  

---

## 1. Risk Assessment Matrix

Risks are quantified by Likelihood (1–5) and Impact (1–5), resulting in a Risk Score (1–25):
- **1–6 (Low):** Monitored within standard operational procedures.
- **8–12 (Medium):** Specific proactive mitigation controls required.
- **15–25 (High/Critical):** Executive management oversight and contingency protocols mandatory.

---

## 2. Identified Operational and Technical Risks

| Risk ID | Risk Description | Category | L (1-5) | I (1-5) | Score | Mitigation & Defense Strategy |
| :--- | :--- | :---: | :---: | :---: | :---: | :--- |
| **RSK-01** | **Digital Literacy Gap:** Village chiefs struggle with complex computer forms. | Operational | 4 | 4 | **16 (High)** | Simplify UI with icon-driven Khmer interface, provide laminated pictorial cheat-sheets, and allow commune clerks to assist in draft entry. |
| **RSK-02** | **Intermittent Power Grid:** Power outages in rural district offices disrupt sessions. | Infrastructure | 4 | 4 | **16 (High)** | Deploy 1500VA Smart UPS on provincial host server; design web forms with local draft auto-saving to prevent data loss during power cuts. |
| **RSK-03** | **Unauthorized Cross-Commune Access:** A reviewer inspects records from another commune. | Security | 2 | 5 | **10 (Med)** | Server-side Eloquent Global Scopes enforce geographic isolation automatically; intrusion attempts immediately abort with 403 Forbidden and audit log alert. |
| **RSK-04** | **Data Corruption During Vital Events:** Concurrent death registrations or household splits cause database inconsistency. | Data Integrity | 2 | 5 | **10 (Med)** | 100% of vital event mutations wrap within ACID database transactions; strict foreign key cascade rules enforce relational health. |
| **RSK-05** | **Staff Turnover at Local Halls:** Trained commune clerks transfer, leaving untrained staff. | Institutional | 3 | 3 | **9 (Med)** | Standardize video training modules in Khmer and institutionalize onboarding checklists for new administrative recruits. |
| **RSK-06** | **Inadvertent Exposure of Citizen PII:** Demographic files or dumps committed to public GitHub. | Cybersecurity | 1 | 5 | **5 (Low)** | Private GitHub repository requirement, automated `.gitignore` blocking `.env` and SQL dumps, and strict synthetic-only demo data covenant. |

---

## 3. Risk Monitoring and Periodic Review
The Risk Register is reviewed bi-weekly during project implementation by the Project Manager and Lead Security Engineer. Any risk experiencing an escalation in likelihood is elevated directly to the Provincial Steering Committee.
